HVAC plans and details; plumbing plans, riser diagrams and details; electrical plans to include power layout, lighting layout, and details. All MEP will be based on the approved plan and equipment layout for the area. Specification sheets will be requested to the owner for the equipment being installed. If not provided, assumptions will be made based on what is standard and typical in each location.